Bridge Protocol
Physical teamwork kit, planning exercise.
A hands-on challenge where teams plan, share knowledge and assemble a working bridge.
- Players per kit
- 4–8 per kit
- Duration
- 45 minutes

The challenge
Use a shared plan and a set of physical pieces to build a stable bridge with limited materials and time.
Goal
Assemble a bridge that meets the span and stability requirements by working together, planning ahead and sharing key information.

Team roles
Give everyone a clear focus. Teams can adapt these roles or combine them.
- Planner
- Interprets the brief, sets a build plan and keeps the team on track.
- Builder
- Leads assembly and checks the structure as it takes shape.
- Materials Lead
- Manages pieces, tracks what’s needed and avoids rework.
- Communicator
- Keeps the team aligned and makes sure key decisions are shared.
Physical pieces (per kit)
A tactile set designed for hands-on planning and construction.
Truss pieces(various lengths)
Connectorbeams
Bridgesupports
Build brief& plan
Facilitator’s debrief
Wrap up with a focused discussion to turn the build into team insights.
- What planning decisions helped you most—and why?
- How did the team share and use information?
- What would you do differently next time?

How six kits handle 48
Run Bridge Protocol with up to 48 people by using six kits at once, each for a team of 4–8.
- Headcount
- 48 people(total headcount)
- Teams
- 6 teams(of 8)
- Kits
- 6 kits(running in parallel)
Choose an event format
Run Bridge Protocol as a single activity or as part of a broader game day. All formats include kits and a facilitator.