Skip to content

Bridge Protocol

Physical teamwork kit, planning exercise.

A hands-on challenge where teams plan, share knowledge and assemble a working bridge.

Players per kit
4–8 per kit
Duration
45 minutes
A team fits the final truss onto a scale timber bridge over a blue blueprint

The challenge

Use a shared plan and a set of physical pieces to build a stable bridge with limited materials and time.

Goal

Assemble a bridge that meets the span and stability requirements by working together, planning ahead and sharing key information.

Timber beams, a truss frame and two stone supports laid out beside a bridge blueprint

Team roles

Give everyone a clear focus. Teams can adapt these roles or combine them.

Planner
Interprets the brief, sets a build plan and keeps the team on track.
Builder
Leads assembly and checks the structure as it takes shape.
Materials Lead
Manages pieces, tracks what’s needed and avoids rework.
Communicator
Keeps the team aligned and makes sure key decisions are shared.

Physical pieces (per kit)

A tactile set designed for hands-on planning and construction.

  • Truss pieces(various lengths)
  • Connectorbeams
  • Bridgesupports
  • Build brief& plan

Facilitator’s debrief

Wrap up with a focused discussion to turn the build into team insights.

  • What planning decisions helped you most—and why?
  • How did the team share and use information?
  • What would you do differently next time?
Six finished timber bridges on blueprints across the studio tables

How six kits handle 48

Run Bridge Protocol with up to 48 people by using six kits at once, each for a team of 4–8.

Headcount
48 people(total headcount)
Teams
6 teams(of 8)
Kits
6 kits(running in parallel)

Choose an event format

Run Bridge Protocol as a single activity or as part of a broader game day. All formats include kits and a facilitator.

Event format